Time and Work Questions for SSC
This test gives you 25 time and work questions in the SSC style: two or three workers together, efficiency, men-days, wages and pipes and cisterns. It runs 15 minutes with +2 and -0.5 marking, and every solution uses the quick LCM method, in Hindi and English, with no sign-up.
Time and Work Practice Test
- Questions
- 25
- Time
- 15 min
- Maximum marks
- 50
- Marking
- +2 / -0.5
| Section | Questions | Marking |
|---|---|---|
| Quantitative Aptitude | 25 | +2 / -0.5 |
Timing: 15 minutes on one clock. You can move freely between sections until time runs out. The test submits itself when time is up.
How the exam screen works
- Pick an option, then Save and next. Mark for review and next flags a question to revisit; a marked question that has an answer is still scored, as in the SSC exam.
- The palette shows each question's state: not visited (grey), not answered (red), answered (green), marked (purple), answered and marked (purple with a green dot).
- Keyboard: keys 1 to 4 choose options A to D, Alt + arrow keys move to the next or previous question.
- Your progress is saved in this browser, so an accidental refresh can be resumed. Nothing is uploaded.
Your attempts
Your attempts of this test will be listed here (saved only in this browser).
Sample questions from this test
A can finish a piece of work in 20 days and B can finish it in 5 days. In how many days can they finish it working together?
- 4 days
- 6 days
- 15 days
- 12.5 days
Show answer and solution
Answer: A. 4 days. Together = (a x b)/(a + b) = (20 x 5)/(25) = 4 days.
A and B together can do a job in 4 days. A alone can do it in 6 days. How many days will B alone take?
- 10 days
- 12 days
- 15 days
- 2 days
Show answer and solution
Answer: B. 12 days. B's one day work = 1/4 - 1/6 = 2/24 = 1/12. So B takes 12 days.
A can do a work in 14 days and B in 35 days. A works alone for 12 days and then leaves. In how many days will B finish the remaining work?
- 7 days
- 4 days
- 5 days
- 23 days
Show answer and solution
Answer: C. 5 days. A does 12/14 of the work, so 2/14 is left. B needs 2/14 x 35 = 5 days.
The fractions method (1/12 + 1/18) works but is slow. The LCM method takes the total work as a whole number, gives each worker a daily efficiency in units, and turns every question into simple division. All solutions in this test use it.
How to practise time and work questions
- Press Start. The test has 25 questions and a 15 minute timer, with +2 for a right answer and -0.5 for a wrong one, the same marking as SSC CGL Tier 1.
- Answer from the question palette. Use Mark for review on any question that needs more than a minute and come back to it at the end.
- Submit, or let the timer submit for you. Read your score, accuracy and the time you spent, then open the full worked solution of every question you got wrong or skipped.
- Rework each wrong answer with the LCM method below and compare the time it takes with your first attempt.
- Retake the test after a few days of revision. Your attempts are saved only in this browser, so you can compare scores without an account.
The LCM method for time and work questions
Take total work = LCM of the given days. A finishes in 12 days and B in 18 days: total work 36 units, A does 3 units a day, B does 2. Together they do 5 a day, so they finish in 36 / 5 = 7.2 days.
Finding one worker: A and B together take 10 days, A alone 15. Total 30 units, A and B do 3 a day, A does 2, so B does 1 and needs 30 days alone.
Efficiency and men-days
Efficiency: A is twice as efficient as B and together they finish in 14 days. Give A 2 units and B 1 unit a day: total work = 3 x 14 = 42 units, so B alone needs 42 days and A alone 21.
Men-days rule: M1 x D1 x H1 / W1 = M2 x D2 x H2 / W2. 12 men finish a job in 15 days, so 18 men need 12 x 15 / 18 = 10 days.
Wages are shared in the ratio of work done, which is the ratio of efficiencies when they work the same number of days.
Pipes and cisterns
A filling pipe is positive work and a leak or emptying pipe is negative work. A pipe fills a tank in 20 hours and another empties it in 30 hours. With LCM 60, they do +3 and -2 units an hour, net 1, so the tank fills in 60 hours.
Time and work and pipes are part of the CGL and CHSL arithmetic syllabus and of GD Elementary Mathematics; most shifts have a question or two.
Checks before you mark an answer
Together must always be faster than the fastest single worker. If your answer for two workers is more than either one alone, something is wrong.
MockTayari is an independent practice site and is not affiliated with SSC, RRB or IBPS.
Frequently asked questions
What is the easiest way to solve time and work questions?
Use the LCM method: total work = LCM of the days, each worker's efficiency = total work / their days, then divide the work by the combined efficiency.
Can I get time and work questions in Hindi?
Yes. The test is bilingual, so every question and solution is also in Hindi (समय और कार्य).
How are pipes and cisterns related to time and work?
They are the same idea. A filling pipe works like a worker and a leak works like negative work, so the LCM method solves both.
Are time and work questions asked in SSC GD?
Yes. Time and work is in the GD Elementary Mathematics syllabus, usually at a simpler two-worker level.